Electrical infrastructure for a new booster and pressure reducing station.
The Zone 3D and 4A Improvements Program installed boosters and water mains to interconnect the City’s north and south systems, so water from wells in the southern part of the City can reach higher elevations that are predominantly served by Colorado River water. IPS provided the electrical BPS/PRV station for the first section of the 4A improvements within the 24th St Water Treatment Plant.
ZONE 3D + 4A
|
Interconnect the City’s systems Boosters and new water mains tie the north and south systems together so water from southern wells can reach higher elevations.
FIRST SECTION
|
Deliver the BPS/PRV station IPS provided the electrical booster and pressure reducing station for the first section of the 4A improvements at the plant.
STATION BUILD
Install gear and wiring We installed 5kV gear, instruments, conduit and conductors for the new station.
Impact + Highlights
Infrastructure built to move water where it is needed.
New electrical infrastructure delivered for the first section of the 4A improvements.
5KV
GEAR INSTALLED
1
NEW BPS/PRV STATION
4A
FIRST SECTION DELIVERED
TBD
ADD A FIGURE FROM THE JOB
Specialized Services
Gear, instruments and the wiring in between.
IPS handled the electrical scope for the new station: the 5kV gear, the instruments, and the conduit and conductors that connect them.
01
Electrical Construction
Installation of conduit, conductors, equipment, and supporting electrical infrastructure.
02
Manufacturing Services
Panel-shop support aligned with field requirements and project sequencing.
03
Design Services
Practical electrical design coordinated around equipment, constructability, and operations.
04
Field Control Services
Instrumentation, controls integration, testing, and startup support in the field.