Deer Valley Water Treatment Plant
- TYPE
- LOCATION
- YEAR
25 new variable frequency drives installed around a running plant, with more than 125,000 feet of power and control conductor pulled.
4AB-10 24th St Water Treatment Plant (Zone 3D and 4A)
- TYPE
- LOCATION
- YEAR
Electrical BPS/PRV station for the first section of the Zone 4A improvements, including 5kV gear, instruments and conductors.
Union Hills Water Treatment Plant
- TYPE
- LOCATION
- YEAR
Plant-wide modernization: 5kV and 480V switchgear and MCCs, blower upgrades, a chlorine scrubber and four PLC replacements.
Shearer’s Phoenix Twin Screw Line
- TYPE
- LOCATION
- YEAR
A new twin-screw production line powered from a 4,000A utility service through to startup and commissioning.
91ST Ave Fire Rehab Water Treatment Plant
- TYPE
- LOCATION
- YEAR
A fire took out an electrical room. IPS rerouted power, secured replacement gear and had the plant running again in four days.